Concrete
Volume + bag count for slabs, footings, posts
Concrete build-up
Reading 3 m
Reading 3 m
Reading 100 mm
Sets the right reinforcement, DPM, and sub-base for the job.
Use ready-mix for jobs over ~1m³ — cheaper & faster than bags.
Reading 10 %
Compacted Type 1 spreads load and stops settlement.
Results
What to buy — 7 items
Opens at Screwfix, Toolstation and the merchants for your trade. Free account, no card.
Take the whole job with you
A free account gets you the Gaffer for the awkward questions, a checklist for the job with every part on a shopping list, and quotes and invoices you can build and price up. Sending them out is Pro. No card needed.
Create your free accountIndicative design aids — the main figures and where each comes from are listed under "Figures based on" below.
Figures based on
- Bag yields (20 kg Postmix 0.011, 25 kg 0.0125, 20 kg pre-mix 0.010, 40 kg 0.020 m³): Typical — the 20 kg pre-mix figure matches Tarmac's Blue Circle High Strength Concrete 40N data sheet (about 0.01 m³ a bag); the others are trade-published figures with no data sheet retrieved. Check the yield printed on the bag you buy
- Custom mix: Geometry — ordered by volume, with the waste you set; no yield is assumed for a mix this calculator cannot know
- Waste allowance: No source — workshop estimate, adjust to suit: an input (default 10%)
- Ready-mix in ¼ m³ steps: No source — workshop figure: a fixed estimating assumption. No minimum load is assumed: ask the plant for its minimum load, its increments and any short-load charge
- MOT Type 1: +15% loose volume shown; bags counted from the laid volume at 2.1 t/m³ compacted, 800 kg bags: Typical — the 15% is a workshop allowance for the loose volume only. The 800 kg bag is from the Wickes MOT Type 1 listing (131895) read 8 Nov 2026 and is the same figure as the gravel / topsoil page; bags vary by merchant. Check your merchant's bag
- Blinding 15 mm of sharp sand, 0.0125 m³ a 25 kg bag: No source — workshop estimate: a fixed estimating assumption
- DPM +15% for laps and turn-ups: No source — workshop estimate: a fixed estimating assumption
- Mesh A142 / A193: BS 4483:2005 fabric designations (A142: 6 mm bars, A193: 7 mm bars, both at 200 mm centres)
- Which mesh (A193 at 125 mm deep or a driveway), +10% for laps, chairs 2 per m²: No source — workshop rule: a fixed estimating assumption. The slab design or the engineer decides the reinforcement
- Formwork perimeter +10%, pegs every 600 mm: No source — workshop estimate: a fixed estimating assumption
- Depths in the use-case labels (75, 100, 150 mm ...): No source — workshop guidance, adjust to suit: the depth is an input
Indicative design aids. A standard is named with its edition; each is still to be checked against the published text. "Typical" means no standard sets it: check the bag, tin, data sheet or supplier named. "No source" means a workshop estimate: adjust to suit, or, where the box says it is fixed, a fixed estimating assumption.