Concrete

Volume + bag count for slabs, footings, posts

Concrete build-up

3 × 3 m, 100 mm deep0.99 m³ with 10% waste80 × 25kg general purpose concrete bagDig 215 mm below finished levelConcrete 100 mmA142 meshDPMSand blinding 15 mmType 1 sub-base 100 mmNot to scale: thin layers drawn thicker
m

Reading 3 m

m

Reading 3 m

mm

Reading 100 mm

Sets the right reinforcement, DPM, and sub-base for the job.

Use ready-mix for jobs over ~1m³ — cheaper & faster than bags.

%

Reading 10 %

Compacted Type 1 spreads load and stops settlement.

Results

Volume needed
0.99m³
Bags needed
80bag
Sub-base
1.03m³
Area9 m²
Net concrete volume0.9 m³
With waste0.99 m³ (+10%)
Sub-base (100mm)1.03 m³
Imperial35 ft³

What to buy — 7 items

25kg general purpose concrete bag
Covers 0.99 m³ inc. 10% waste
80 bag
MOT Type 1 sub-base (bulk bag, 800 kg)
100mm compacted · 1.03 m³ loose (inc. 15% compaction) · about 1.9 t laid at 2.1 t/m³. Bags vary by merchant; check yours
3 bag
25kg Sharp sand bag (blinding)
15mm blinding layer over Type 1
11 bag
DPM 1200-gauge (damp-proof membrane)
Inc. 150mm lap & turn-up at edges
11 m²
A142 mesh sheet (4.8m × 2.4m)
Lap 1 full square (~150mm). A142 = 6mm bar on 200mm grid.
1 sheet
Mesh chair / spacer (50mm)
Keeps mesh in middle 1/3 of slab
18 pc
100×25mm treated softwood (formwork)
Plus 50×50mm pegs every 600mm
14 m

Opens at Screwfix, Toolstation and the merchants for your trade. Free account, no card.

Take the whole job with you

A free account gets you the Gaffer for the awkward questions, a checklist for the job with every part on a shopping list, and quotes and invoices you can build and price up. Sending them out is Pro. No card needed.

Create your free account

Indicative design aids — the main figures and where each comes from are listed under "Figures based on" below.

Figures based on

  • Bag yields (20 kg Postmix 0.011, 25 kg 0.0125, 20 kg pre-mix 0.010, 40 kg 0.020 m³): Typical — the 20 kg pre-mix figure matches Tarmac's Blue Circle High Strength Concrete 40N data sheet (about 0.01 m³ a bag); the others are trade-published figures with no data sheet retrieved. Check the yield printed on the bag you buy
  • Custom mix: Geometry — ordered by volume, with the waste you set; no yield is assumed for a mix this calculator cannot know
  • Waste allowance: No source — workshop estimate, adjust to suit: an input (default 10%)
  • Ready-mix in ¼ m³ steps: No source — workshop figure: a fixed estimating assumption. No minimum load is assumed: ask the plant for its minimum load, its increments and any short-load charge
  • MOT Type 1: +15% loose volume shown; bags counted from the laid volume at 2.1 t/m³ compacted, 800 kg bags: Typical — the 15% is a workshop allowance for the loose volume only. The 800 kg bag is from the Wickes MOT Type 1 listing (131895) read 8 Nov 2026 and is the same figure as the gravel / topsoil page; bags vary by merchant. Check your merchant's bag
  • Blinding 15 mm of sharp sand, 0.0125 m³ a 25 kg bag: No source — workshop estimate: a fixed estimating assumption
  • DPM +15% for laps and turn-ups: No source — workshop estimate: a fixed estimating assumption
  • Mesh A142 / A193: BS 4483:2005 fabric designations (A142: 6 mm bars, A193: 7 mm bars, both at 200 mm centres)
  • Which mesh (A193 at 125 mm deep or a driveway), +10% for laps, chairs 2 per m²: No source — workshop rule: a fixed estimating assumption. The slab design or the engineer decides the reinforcement
  • Formwork perimeter +10%, pegs every 600 mm: No source — workshop estimate: a fixed estimating assumption
  • Depths in the use-case labels (75, 100, 150 mm ...): No source — workshop guidance, adjust to suit: the depth is an input

Indicative design aids. A standard is named with its edition; each is still to be checked against the published text. "Typical" means no standard sets it: check the bag, tin, data sheet or supplier named. "No source" means a workshop estimate: adjust to suit, or, where the box says it is fixed, a fixed estimating assumption.