Drainage Fall
Gradient 1:N → fall over length
Reading 6 m
Choose your own to check the gradient you are actually laying.
Reading 0 mm
Results
What to buy — 5 items
Opens at Screwfix, Toolstation and the merchants for your trade. Free account, no card.
Take the whole job with you
A free account gets you the Gaffer for the awkward questions, a checklist for the job with every part on a shopping list, and quotes and invoices you can build and price up. Sending them out is Pro. No card needed.
Create your free accountIndicative design aids — the main figures and where each comes from are listed under "Figures based on" below.
An indicative fall and gradient check. It does not size the drain for its flow and does not demonstrate compliance with the Building Regulations.
Figures based on
- Minimum gradients checked: 100 mm foul 1:40 (any flow), 1:80 (1 l/s or more with a WC); 150 mm foul 1:150 (five or more WCs): Approved Document H 2015 edition (England), Table 6 "Minimum gradients for foul drains". Consistent across secondary sources (Unda, LABC, Flood & Water Pumps) but still to be confirmed against the gov.uk PDF, which could not be read from here. Wales has its own Part H guidance (2023)
- Fall, slope and bottom invert: Geometry — fall = length ÷ N; slope = 1 ÷ N; bottom invert = top invert + fall
- Typical gradient for each pipe (1:40, 1:80, 1:20, 1:18, 1:60, 1:600, 1:200, 1:50): No source — workshop figures, adjust to suit: "My own gradient" replaces them. Only the two foul-drain rows above are checked against a minimum; for condensate, follow the boiler maker's instructions
- Two bends, clips at 0.5 m (waste, condensate), gutter brackets at 1 m, bedding 50 kg per m: No source — workshop estimate: fixed estimating assumptions. The pipe or gutter maker's instructions win
- Pipe in 3 m lengths, gutter in 4 m: Typical — common stock lengths. Check what your merchant sells
Indicative design aids. A standard is named with its edition; each is still to be checked against the published text. "Typical" means no standard sets it: check the bag, tin, data sheet or supplier named. "No source" means a workshop estimate: adjust to suit, or, where the box says it is fixed, a fixed estimating assumption.