Built for Joiners & Carpenters

AI Job Prep for Joiners & Carpenters

Kitchen fits, staircases, first and second fix — describe the job and get the kit list, the timber list and the sums before you load the van. Stair riser, going and 2R+G worked out so you can check them against Doc K, stud centres and board counts done, fixings on the shopping list.

Free plan, no card needed. Pro is £24/month, with 5 days to try it.

One Job, Start To Finish

Ask, work it out, buy it, tick it off — each step hands to the next. No app hopping.

01

Ask

"Kitchen fit Monday, what do I need?" The Gaffer lists the kit, the fixings and the bits to check before you leave — plinth heights, service positions, wall plumb.

02

Work it out

Stair riser, going and 2R+G for the Doc K check, stud centres for a 4m partition, boards per wall. The numbers go straight into the calculator, nothing retyped.

03

Buy it

Timber, plasterboard, screws and glue land on a shopping list with a Travis Perkins, Toolstation or Screwfix link on every line.

04

Tick it off

The lot sits on the job's checklist. Tick it in the van, send it to the lad doing second fix, invoice when the doors hang.

What a Joiner Checklist Looks Like

AI-generated in under 60 seconds from your job description. Every section editable, shareable, downloadable.

Confirm Before Leaving
Measure openings and floor-to-ceiling on site, not off the drawing
Check door handing and swing with the client
Find services in the wall before you fix anything
Confirm plaster is dry enough for second fix
PPE & Safety
FFP3 mask for MDF and hardwood dust
Eye protection for routing and mitre cuts
Ear defenders for track saw and planer
Cut-resistant gloves for handling sheet material
Tools & Equipment
Mitre saw and stand, blade fresh
Track saw and rail for sheet cuts
Laser level and long spirit level
Router, chisels sharp, clamps — more than you think
Consumables & Fixings
Screws by length: 40, 50, 70, 100mm
Wood glue, grab adhesive, packers
Expanding foam and decorators' caulk
Sandpaper 80 to 240, pencils, blades
Paperwork & Access
Measurement sheet and drawings
Client sign-off on kitchen layout
Delivery slot and parking for sheet material
Waste plan for offcuts and packaging
Pro Tips
Label every offcut by wall before you leave the saw
Check the floor is level before you set plinth height
Photograph service positions before the boards go on
On-Site AI Assistant

Need Help On Site?
Ask the Gaffer.

30 years of trade know-how in your pocket. Straight answers to on-site problems, specific to the job you describe — and it reminds you of the bits you'd only remember halfway there.

Instant trade-specific answers
Photo analysis for on-site problems
Safety-first with reg references

The Gaffer

Your AI site mate

"13 risers, 2600mm floor to floor — what riser and going do I need to pass Doc K?"

2600 over 13 gives you a 200mm riser, which is inside the 150 to 220 domestic limit. Pair it with a 250mm going: twice the rise plus the going is 650, bang in the 550 to 700 band, and the pitch works out at 38.7 degrees, under the 42 maximum. Keep every riser the same to the millimetre — that is the thing Building Control measures.

Always verify to current regs. On-site conditions may vary.

Checklist to Shopping List. One Tap.

Tick the items you need, generate an instant shopping list sorted by category. No more wandering the wholesaler trying to remember fixings.

MaterialsFixings & FastenersConsumablesPPE & SafetyToolsMisc & Sundries

Common Questions

Does the stair calculator follow UK Building Regulations?

It gives riser height, going, 2R+G and stringer length for a rise and run, with the Doc K riser limit shown beside the input. The private-stair limits are riser 150 to 220mm, going 220 to 300mm, 2R+G between 550 and 700mm, pitch no more than 42 degrees. It does not stop you entering a stair outside them, so check the numbers against the current document for your job.

Is it for joiners or carpenters?

Both. First fix, second fix, bench joinery, kitchen fitting, decking and stud work all describe the same way. The checklist and the calculators adapt to the job you describe.

Can I send the checklist to the lad on site?

Yes. On Pro you share the checklist by link or add crew to a team, so whoever is doing the fit turns up with the same list you built.

Stop Forgetting Your Kit

Describe the job. Get a checklist. Leave prepared. It takes 60 seconds.

Free to start — no card needed Cancel anytime